Numerous customers trust us
All
Electromechanical
Elevator
Fire safety
fire-safety
Construction de l’ISSAT de Kasserine (détection incendie, réseau informatique et téléphonique)
Client : Ministère de l’éducation et de l’eseignement superieurConstruction of ISSAT Kasserine (fire detection, computer and telephone network)
Ministry of education and higher educationProcurement and installation of electrical cabinets at the Kairouan military base
Client: Ministry of DefenseHigh availability of power supplies in the computer rooms of the headquarters of the housing bank
Client: Housing bank + endorsementProject to acquire a 400KVA generator at A FSI LA MARSA hospital LOT: ELECTRICITY
Client: Ministry of the Interior, FSI La Marsa HospitalElectrification works of the Kondar municipal stadium
Client: Ministry of EquipmentConstruction of the Higher Institute of Applied Studies in Humanity of Zagouan: Ministry of Higher Education, Scientific Research and Technology (electricity and security)
Client: Ministry of Higher Education, Scientific Research and TechnologyRehabilitation of the electrical installation of the Palace of Beit El Hikma and fire safety
Customer: INST. NAT. HERITAGETransformer station power increase project
Client: TERIAKSupply, installation and commissioning of two 25KVA-380V-50Hz three-phase overhead MV/LV transformer stations
Client: National Company of Tunisian RailwaysInstallation of equipment for a 250KVA transformer station and outdoor lighting at the Kairouan military hospital
Client: Ministry of National DefenseRealization of a transformer station and a TGBT at the general management of Aouina works
Client: Department of National DefenseRenovation of the electrical installations of the Mohamed KASSAB institute of orthopedics in Ksar Said. Batch: Transformer station
Client: Ministry of Public HealthConstruction from El Ala of the HTB/HTA Hajeb substation
Client: STEG KairouanSupply, equipment and installation of a transformer station in the residential project called “RIHAB ENNASR II”
Client: The real estate of the avenueConstruction of the headquarters of the regional directorate of Jendouba
Client: Tunisia TelecomAcquisition and installation of an elevator at the PACKTEC technical center
Client: PACKTEC CENTER Number: 1 Nominal Load: 630Kg – 3 VINInstallation of a 1600 kg sick lift at the mongi slim hospital in la marsa
Client: mongi slim hospital in la marsa Number: 1 Nominal Load: 1600kg – 4NIVElevator in the general direction of technical services
Client: Municipality of Sfax Number: 1 Nominal Load: 630Kg – 7 VINRedevelopment of the headquarters of the General Administrative and Financial Inspectorate of the Ministry of Education: elevator lot
Client: Ministry of Education Number: 1 Nominal Load: 450Kg – 5 VINAcquisition and installation of an elevator in the municipal building located on boulevard 9 avril 1938 la kasbah
Client: TOWN HALL OF TUNIS Number: 1 Nominal Load: 800kg – 4 VINProject acquisition and installation of an elevator at Ras Djebel hospital
Ras Jbel Hospital Number:1 1600Kg – 2 LevelRenovation of elevators at the Zaghouan regional hospital
Zaghouan Regional Hospital Number:5 2 x 250Kg – 3 Level 2 x 1600Kg – 4 Level 1 x 1000Kg – 4 LevelInstallation of load lifts and sick lifts at the Taher sfar university hospital
Taher Sfar University Hospital Number:2 800Kg – 2 Level 1600Kg – 2LevelRenovation project for two sick lifts and an elevator for staff at the Gabes regional hospital
Gabes Regional Hospital Number:3 630Kg – 7 Level 1250Kg – 2 Level 1250Kg – 8 LevelProject for the redevelopment of the equipment depots of the general equipment and material directorate in El Omrane
Ministry of Interior Number:1 Hydraulic 2000Kg – 2 LevelJudicial police directorate construction project in El Gorjani
Ministry of Interior Number:5 630Kg – 5 LevelCompletion of head office fittings sub-directorate of operations and follow-up of the general directorate of public security
Ministry of Interior Number:1 630Kg – 5 LevelProject to install an elevator at the El Khawarizmi Computing Center
El Khawarizmi Computing Center Number:1 630Kg – 3 LevelSupply and installation of two elevators at the CERT head office
Center for Communication Studies and Research Number:2 630Kg – 5 LevelConstruction of the Headquarters of the Regional Directorate of Land Ownership of Kairouan
Ministry of State Domains and Land Affairs 630Kg -5 Level 100Kg -5 LevelExtension project of the national research center in materials sciences of Borj Cedria
Ministry of Higher Education 1000Kg – 2 Level, 1000Kg – 3 LevelCompletion works of the higher institute of applied sciences and technology of Kasserine
Ministry of Higher Education 630Kg – 2 LevelConstruction of the institute of applied sciences and technology of Kairouan
Ministry of Higher Education 400Kg – 2 LevelConstruction project of the higher institute of informatics of Mahdia
Ministère de l'Enseignement supérieur 630Kg - 3 NivAgences Gouvernementales
Réaménagement des locaux informatiques et de la salle des serveurs au siège du CRNE situé à la cité olympique à Tunis - Centre National des Registres des Entreprises.Ministére de la santé
Hôpital universitaire Tahersfar Mahdia – Installation et mise en service des montages Hôpital regionnal Ibn JazzarKairouen
All
Elevator
VDI
Fire and Gas Detection
Building Electricity
Electricity and fire safety
Industrial electricity
Automatic Shutdown
Fire Fighting
get in sick
Goods lift
Transformer station
poste-de-transformation-en